ESPAÑOL

16 STATE SUBSIDIZED HOUSING IN “LA VENTILLA“. MADRID
  • RES01_p10_VIVIENDAS-VPO-EN-LA-VENTILLA-MADRID.jpg
  • RES03_p10.jpg
  • Client

    Instituto de la Vivienda de Madrid

     

    Contractor

    Urbopama

     

    Floor surface

    2.517 m2

     

    Budget

    1.311.021 €

     

    Collaborators

    Concepción Moreno; David Pablos; Antonio Laiz

     

    Consultants

    Structural engineer: IBB

    Services engineer: BJE-R, DMM

     

    Work stages

    Design Development Project:December 2.002

    Construction Project: March 2.003

    Construction: 2.004-2.006