ESPAÑOL

170 BIOCLIMATIC STATE SUBSIDIZED HOUSING IN THE U.A.29. ALBACETE
  • RES01_p6_VIVIENDAS-VPO-EN-ALBACETE.jpg
  • RES02_p6.jpg
  • RES013_p6.jpg
  • RES04_p6.jpg
  • RES015_p6.jpg
  • Client

    Gicaman / Dir. Gral Vivienda Castilla-La Mancha

     

    Contractor

    Comsa

     

    Floor surface

    23.450 m2

     

    Budget

    15.669.011 €

     

    Collaborators

    Miguel Jiménez; Gabriel Ávalos; Concepción Moreno; David Pablos; Pedro Cantó

     

    Consultants

    Structural engineer: Cross

    Services engineer: BJE2, DMM

     

    Work stages

    Design Development Project: November 2.002

    Construction Project: March 2.003

    Construction: 2.007-2009


    Photographs

    Miguel de Guzmán; GilNagel Arquitectos